 |
|
The Bio-diesel facility on Jurong Island is among the earliest bio-diesel plants built in Singapore and one of the largest in the world. The owner is Natural Fuel Pte Ltd (Singapore), whose parent co...
Details |
| |
 |
|
The addition of fourteen storeys above the existing four-storey podium block was made possible by massive strengthening of the existing foundations and columns to support the enormous loads coming fro...
Details |
| |
 |
|
The Singapore Cricket Club, gazetted as a Conservation Building by Urban Redevelopment Authority (URA), was built in three phases with the original building being built in 1884. In its existing form, ...
Details |
| |
 |
|
The Keppel Viaduct is part of the Ayer Rajah Expressway and spans 2.2 km in a very crowded city centre area.
In order to cater to the heavy volume of traffic from the new Marina Coastal Expressway,...
Details |
| |
 |
|
The 2.4km Circle Line Extension (CCL) will be a fully underground automated rail transit system that extends from CCL Promenade Station via Downtown Line Stage 1 (DTL1) Bayfront Station to the CCL Mar...
Details |
| |
 |
|
A fast-tracked delivery driven to the highest standards for the world's first night race necessitated very close and strict supervision of all the works.
This project involved the widening of the pr...
Details |
| |
 |
|
Due to improper foundation design and construction, this eight-storey apartment block progressively settled differentially during the course of construction.
This settlement had reached a maximum of ...
Details |
| |
 |
|
The Abdul Gafoor Mosque is a National Monument built in 1857. In its original form, it was a single-storey masonry structure with the terrace roof of a madrasah. The foundation system consisted of sha...
Details |
| |
 |
|
The blocks were characterized by weak concrete cracks, honeycombing, widespread spalling, gaps and presence of foreign material in concrete. The sudden buckling of a first storey column in one of the ...
Details |
| |
 |
|
The 4.3km fully-underground Down Town Line 1 (DTL1) will comprise six stations: Chinatown, Cross Street, Landmark, Bayfront, Promenade and Bugis. Construction for DTL1 will be completed by 2013.
Wh...
Details |
| |