We recognize the importance of creating an infrastructure that enables a country to move forward and grow. We provide solutions to meet our clients' challenges that are driven by population growth, aging infrastructure, increased leisure time, national legislation, environmental considerations, and water resource limitations.
CKM has provided its services for many infrastructure projects and is proud of the work that it has accomplished. We are involved in constructing or rehabilitating power facilities, utilities, roads and bridges, tunnels and systems. We also provide rapid assessments and repairs of wide-ranging infrastructure systems. CKM is a team player and has demonstrated its ability to work with government agencies, local contractors, and commercial owners.
 |
|
The 2.4km Circle Line Extension (CCL) will be a fully underground automated rail transit system that extends from CCL Promenade Station via Downtown Line Stage 1 (DTL1) Bayfront Station to the CCL Mar...
Details |
| |
 |
|
The 4.3km fully-underground Down Town Line 1 (DTL1) will comprise six stations: Chinatown, Cross Street, Landmark, Bayfront, Promenade and Bugis. Construction for DTL1 will be completed by 2013.
...
Details |
| |
 |
|
The Keppel Viaduct is part of the Ayer Rajah Expressway and spans 2.2 km in a very crowded city centre area.
In order to cater to the heavy volume of traffic from the new Marina Coastal Expresswa...
Details |
| |
 |
|
The 4.3km fully underground DTL1 will comprise six stations: Chinatown, Cross Street, Landmark, Bayfront, Promenade and Bugis. Construction for DTL1 will be completed by 2013. When completed, DTL1 wi...
Details |
| |
 |
|
This project involves the construction of a 1400/1800mm diameter pipeline along SLE Expressway from Lentor Ave to Western Road Link which will convey treated water from the Proposed Lower Seletar Wate...
Details |
| |
 |
|
Ang Mo Kio is one of the most mature estates in Singapore. With the constant increase in traffic, there has come a need to widen the roads and increase the number of lanes. This project involves the...
Details |
| |
 |
|
Ang Mo Kio is one of the most mature estates in Singapore. With the constant increase in traffic, there has come a need to widen the roads and increase the number of lanes. This project involves the...
Details |
| |
 |
|
A fast-tracked delivery driven to the highest standards for the world's first night race necessitated very close and strict supervision of all the works.
This project involved the widening of the ...
Details |
| |
 |
|
This project involves the construction of 3.3 km of 500mm diameter NEWater ductile-iron pipeline from Xilin Ave/Laguna Golf Green junction to Airport Boulevard, 0.7 km of 300mm diameter NEWater ductil...
Details |
| |
 |
|
Opened in 1982, the Benjamin Sheares Bridge is the longest bridge in Singapore, spanning 1.855 km, and the tallest, at 20 m. Built over reclaimed land, the bridge has 23 spans and is made of pre-stres...
Details |
| |
 |
|
In order to relieve congestion at this busy junction, an additional lane was added on either carriageway. In addition to this, slip roads were introduced at all 4 corners of the junction make traffic...
Details |
| |
 |
|
This project involved the construction of 2250m stretch of 1200mm diameter sewer to serve part of the newly-developed Tuas Industrial Estate. The geology on this project was complex as it included rec...
Details |
| |
 |
|
The concept behind the DTSS is to intercept existing sewage flows at or upstream of the existing pumping stations and sewage treatment works, and to transport these flows by gravity through the link s...
Details |
| |
 |
|
The Drainage Department, being the drainage authority, is responsible for putting in place an extensive network of drains and canals across the island to channel storm water from designated catchment ...
Details |
| |
 |
|
This is the first multi-level interchange in Singapore. The work presented great challenges to structural design. CKM was engaged by the Land Transport Authority (LTA) to carry out design verification...
Details |
| |
|
|
|
Terminal 1 is presently undergoing a major upgrading from May 2008, with completion slated for 2011. The scope of work is to upgrade 90,000 square metres of existing space, primarily in passenger area...
Details |
| |
|
|
|
The Kallang/Paya Lebar Expressway is a 12 km long expressway with four lanes in each direction and is the longest tunnel in South East Asia. Contract 423 is one of the six construction contracts and m...
Details |
| |