 |
|
The project involves a new campus for Stamford American International School (SAIS) with a project cost of approximately S$100million. The campus consists of four blocks together with ancillary facili...
Details |
| |
 |
|
The third phase of Australian International School connects Phase I and Phase II developments. This project involves the expansion of teaching facilities, a new canteen area and a pick-up/drop off are...
Details |
| |
 |
|
Fontaine Parry is a luxury private residential 5-storey development with 125 units in the north-eastern part of Singapore. Fontaine Parry has a host of amenities such as an elliptical main, kids' and...
Details |
| |
 |
|
The Singapore American School embarked on a major upgrading exercise in 2006. The first phase was the construction of a grandstand at its soccer field and the retrofitting of the High School gymnasiu...
Details |
| |
 |
|
A total of 4 warehouses, with a total built-up area of approximately 45,000 square metres, were constructed at the Jurong Port berths J4, J5 and J12. The works also involved the upgrading of the berth...
Details |
| |
 |
|
The upgrading works were mainly at the entrance plaza which consists of the gift shops, ticketing areas, administration building, F&B outlets, sheltered linkways and toilets. The entrance plaza was c...
Details |
| |
 |
|
The Night Safari, the world's premier nocturnal zoo, is acclaimed as one of the world's most spectacular zoos.
CKM was engaged to do upgrading works at the entrance plaza which consists of the gift ...
Details |
| |
 |
|
Kovan Primera is a luxury private residential development in the north-eastern part of Singapore with full facilities such as a BBQ area, a swimming pool and a gymnasium....
Details |
| |
 |
|
This project is the construction of the new five-storey Junior School and Sixth Form College at the Tanglin Trust School along Portsdown Road. This is phase I of the expansion programme to cater to th...
Details |
| |
 |
|
The Singapore American Club has undergone much transformation over the years. Some projects done there were:
1. the construction of the kidz zone in 1998 which was later converted to a spa
2. Retrof...
Details |
| |
 |
|
The addition of fourteen storeys above the existing four-storey podium block was made possible by massive strengthening of the existing foundations and columns to support the enormous loads coming fro...
Details |
| |